Buch, Englisch, 208 Seiten, Format (B × H): 156 mm x 234 mm, Gewicht: 327 g
Buch, Englisch, 208 Seiten, Format (B × H): 156 mm x 234 mm, Gewicht: 327 g
ISBN: 978-0-367-67526-4
Verlag: CRC Press
This book covers execution of mega industrial projects especially in oil and gas industries covering engineering, procurement, construction, commissioning and performance testing. It enumerates various tasks and deliverables under each discipline and sub-disciplines to define the detailed scope of work, supplies and services, as per level III of Prima Vera Schedule developed from the contract-based schedule. It gives an overall idea of how a project rolls out from commencement date to initial acceptance and executed practically with total contractor’s scope of work broken down into tasks/activities at level III platform, while highlighting that support for fool proof project execution.
Zielgruppe
Academic and Professional Practice & Development
Autoren/Hrsg.
Fachgebiete
- Technische Wissenschaften Energietechnik | Elektrotechnik Technologien für Fossile Energieträger
- Geowissenschaften Geologie Wirtschaftsgeologie
- Wirtschaftswissenschaften Betriebswirtschaft Management Projektmanagement
- Technische Wissenschaften Sonstige Technologien | Angewandte Technik Ölförderung, Gasförderung
- Technische Wissenschaften Verfahrenstechnik | Chemieingenieurwesen | Biotechnologie Verfahrenstechnik, Chemieingenieurwesen
- Technische Wissenschaften Technik Allgemein Technik: Allgemeines
- Technische Wissenschaften Technik Allgemein Industrial Engineering
Weitere Infos & Material
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and Administration. 2. HSE, Social and Security. 3. Services and Facilities to Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning, Start-up and Performance Test. 10. Temporary Facilities. SECTION II COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12. Extension of Time. 13. Professionally Handling Large Claims. 14. Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays. 16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25. Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29. Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract Price below Floor Price and Consequences. 32. Owner’s Delay on Document Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells (Owner Delays). 36. Strategy for using Non-Spec Feedstock for Commissioning. 37. Gas In and Authority Check points. 38. Value Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT (Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2. Contract Price Weight Factor. 3. Monthly Status Report Contents. 4. Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter. 9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of Procedures and Plans. 11. Total Plant Break down into Areas.