Buch, Englisch, 288 Seiten, Format (B × H): 156 mm x 234 mm, Gewicht: 408 g
Reihe: ICOLD Bulletins Series
Buch, Englisch, 288 Seiten, Format (B × H): 156 mm x 234 mm, Gewicht: 408 g
Reihe: ICOLD Bulletins Series
ISBN: 978-1-138-49008-6
Verlag: CRC Press
- Diaphragm walls
- Vib walls
- Pile walls
- Superimposed concreted galleries
- Jet grouting
- Deep mixing
These methods are described, and the practical application of each method is illustrated by selected case histories. These case histories also demonstrate how certain difficulties specific to a particular dam site have been dealt with. The performance of cutoffs should be monitored so that their efficiency in reducing flow and piezometric head can be evaluated. Piezometers installed in the foundation upstream and downstream of the cutoff are needed to meet this objective.
Zielgruppe
Postgraduate and Professional
Autoren/Hrsg.
Fachgebiete
Weitere Infos & Material
1 Introduction
2 Need of cutoffs in dam foundations
3 Diaphragm walls
4 Vib walls
5 Pile wall
6 Superposed concreted galleries
7 Jet grouting
8 Deep mixing
Appendix 1 - Case histories on diaphragm walls