NCCER | Pipeline Maintenance Trainee Guide, Level 2 | Buch | 978-0-13-471653-4 | www.sack.de

Buch, Englisch, 576 Seiten, Format (B × H): 216 mm x 276 mm, Gewicht: 1409 g

NCCER

Pipeline Maintenance Trainee Guide, Level 2


3. Auflage 2024
ISBN: 978-0-13-471653-4
Verlag: Pearson

Buch, Englisch, 576 Seiten, Format (B × H): 216 mm x 276 mm, Gewicht: 1409 g

ISBN: 978-0-13-471653-4
Verlag: Pearson


This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes:

CT15_1-17 Visually Inspect Surface Conditions of Right-of-Way

CT16_1-17 Inspect Navigable Waterway Crossing

CT27_1-17 Routine Inspection of Breakout Tanks (API 653 monthly or DOT annual)
CT28_0-17 Provide Security for Pipeline Facilities

CT34_0-17 Inspect Existing Pipe Following Movement

CT37_0-17 Install or Repair Support Structures on Existing Above Ground Components

CT38_1-17 Visually Inspect Pipe and Pipe Components Prior to Installation

CT39_0-17 Backfilling a Trench Following Maintenance

CT52_1-17 Conduct Vegetation Survey

CT52_2-17 Conduct a Leak Survey with a CGD

CT52_3-17 Conduct a Leak Survey with a Flame Ionization Unit

CT59_0-17 Vault Maintenance (Gas)

CTCC-17 Cold Cutting

CTFB-17 Flange Bolting

CTMP-17 Mud Plugging

CTTB-17 Tubing

CTTP-17 Threaded Pipe Fabrication

Instructor Supplements

Instructors: Product supplements may be ordered via our ordering department at 1-800-922-0579 or directly through OASIS at http://oasis.pearson.com.

Instructor Access Card Provides access to PowerPoints, Lesson Plans and Performance Profile sheets

Instructor's Resource Card  ISBN: 9780134716558   

Price $100

NCCER Pipeline Maintenance Trainee Guide, Level 2 jetzt bestellen!

Autoren/Hrsg.


Weitere Infos & Material


CT15_1-17 Visually Inspect Surface Conditions of Right-of-Way

CT16_1-17 Inspect Navigable Waterway Crossing

CT27_1-17 Routine Inspection of Breakout Tanks (API 653 monthly or DOT annual)
CT28_0-17 Provide Security for Pipeline Facilities

CT34_0-17 Inspect Existing Pipe Following Movement

CT37_0-17 Install or Repair Support Structures on Existing Above Ground Components

CT38_1-17 Visually Inspect Pipe and Pipe Components Prior to Installation

CT39_0-17 Backfilling a Trench Following Maintenance

CT52_1-17 Conduct Vegetation Survey

CT52_2-17 Conduct a Leak Survey with a CGD

CT52_3-17 Conduct a Leak Survey with a Flame Ionization Unit

CT59_0-17 Vault Maintenance (Gas)

CTCC-17 Cold Cutting

CTFB-17 Flange Bolting

CTMP-17 Mud Plugging

CTTB-17 Tubing

CTTP-17 Threaded Pipe Fabrication




Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.