NCCER | Pipeline Operations Trainee Guide, Level 2 | Buch | 978-0-13-472539-0 | www.sack.de

Buch, Englisch, 512 Seiten, Format (B × H): 216 mm x 276 mm, Gewicht: 1256 g

NCCER

Pipeline Operations Trainee Guide, Level 2


3. Auflage 2024
ISBN: 978-0-13-472539-0
Verlag: Pearson

Buch, Englisch, 512 Seiten, Format (B × H): 216 mm x 276 mm, Gewicht: 1256 g

ISBN: 978-0-13-472539-0
Verlag: Pearson


This exceptionally produced trainee guide features a highly illustrated design, technical hints and tips from industry experts, review questions and a whole lot more! Key content includes: 

CT50_0-17 Purge Gas from a Pipeline (Gas)
CT51_0-17 Purge Air from a Pipeline (Gas)
CT54_0-17Test Remotely Controlled Shutdown Devices (Gas)
CT56_0-17 Perform Incremental Pressure Increases to Uprate the MAOP (Gas)
CT57_0-17 Operate Odorant Equipment
CT58_0-17 Monitor Odorant Level
CT63_1-17 Start-up of a Liquid Pipeline (Field)
CT63_3-17 Monitor Pressures, Flows, Communications, and Line Integrity and Maintain Them Within Allowable Limits on a Liquid Pipeline System (Field)
CT63_4-17 Locally Operate Valves on a Liquid Pipeline System
CT64_1-17 Start-up of a Liquid Pipeline (Control Center)
CT64_2-17 Shutdown of a Liquid Pipeline (Control Center)
CT64_3-17 Monitor pressures, flows, communications, and line integrity and maintain them within allowable limits on a liquid pipeline system (control center)
CT64_4-17 Remotely operate valves on a liquid pipeline system
CT65_1-17 Start-up of a pipeline (gas)
CT65_2-17 Shutdown of a pipeline (gas)
CT65_3-17 Monitor pressures, flows, communications and line integrity and maintain them within allowable limits (gas)
CT65_4-17 Manually or remotely open or close valves or other equipment (gas)

Instructor Supplements

Instructors: Product supplements may be ordered via our ordering department at 1-800-922-0579 or directly through OASIS at http://oasis.pearson.com.

Instructor Access Card Provides access to PowerPoints, Lesson Plans and Performance Profile sheets

Instructor's Resource Card  ISBN: 9780134716558   

Price $100

NCCER Pipeline Operations Trainee Guide, Level 2 jetzt bestellen!

Autoren/Hrsg.


Weitere Infos & Material


CT50_0-17 Purge Gas from a Pipeline (Gas)CT51_0-17 Purge Air from a Pipeline (Gas)CT54_0-17Test Remotely Controlled Shutdown Devices (Gas)CT56_0-17 Perform Incremental Pressure Increases to Uprate the MAOP (Gas)CT57_0-17 Operate Odorant EquipmentCT58_0-17 Monitor Odorant LevelCT63_1-17 Start-up of a Liquid Pipeline (Field)CT63_3-17 Monitor Pressures, Flows, Communications, and Line Integrity and Maintain Them Within Allowable Limits on a Liquid Pipeline System (Field)CT63_4-17 Locally Operate Valves on a Liquid Pipeline SystemCT64_1-17 Start-up of a Liquid Pipeline (Control Center)CT64_2-17 Shutdown of a Liquid Pipeline (Control Center)CT64_3-17 Monitor pressures, flows, communications, and line integrity and maintain them within allowable limits on a liquid pipeline system (control center)CT64_4-17 Remotely operate valves on a liquid pipeline systemCT65_1-17 Start-up of a pipeline (gas)CT65_2-17 Shutdown of a pipeline (gas)CT65_3-17 Monitor pressures, flows, communications and line integrity and maintain them within allowable limits (gas)CT65_4-17 Manually or remotely open or close valves or other equipment (gas)



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.