Liebe Besucherinnen und Besucher,
heute ab 15 Uhr feiern wir unser Sommerfest und sind daher nicht erreichbar. Ab morgen sind wir wieder wie gewohnt für Sie da. Wir bitten um Ihr Verständnis – Ihr Team von Sack Fachmedien
E-Book, Englisch, Band 686, 288 Seiten, eBook
Kuschel Capacitated Planned Maintenance
1. Auflage 2017
ISBN: 978-3-319-40289-5
Verlag: Springer International Publishing
Format: PDF
Kopierschutz: 1 - PDF Watermark
Models, Optimization Algorithms, Combinatorial and Polyhedral Properties
E-Book, Englisch, Band 686, 288 Seiten, eBook
Reihe: Lecture Notes in Economics and Mathematical Systems
ISBN: 978-3-319-40289-5
Verlag: Springer International Publishing
Format: PDF
Kopierschutz: 1 - PDF Watermark
This book examines the problem of maintenance planning and scheduling in industrial production systems. It presents two practically relevant, deterministic mathematical models: the capacitated planned maintenance problem (CPMP) and the weighted uncapacitated planned maintenance problem (WUPMP). It introduces specific optimization algorithms such as construction heuristics, Lagrangean and tabu search metaheuristics. A problem independent hybrid approach links and alternates between two Lagrangean relaxations. It also analyzes the solvability with respect to the computational complexity of several problem classes, polyhedral properties and lower bounds. Computational studies demonstrate the performance of the heuristics, lower bounds, subgradients obtained from heuristics and the quality of dual information. This unique book includes implementation details and an introduction to the necessary theory making it suitable for upper undergraduate students.
Zielgruppe
Research
Autoren/Hrsg.
Weitere Infos & Material
Introduction.- The Capacitated Planned Maintenance Problem.- Known concepts and solution techniques.- The Weighted Uncapacitated Planned Maintenance Problem.- Analyzing the solvability of the Capacitated Planned Maintenance Problem.- Algorithms for the Capacitated Planned Maintenance Problem.-Computations for the Capacitated Planned Maintenance Problem.- Final remarks and future perspectives.