Lark / ICE | Bridge Design Construction and Maintenance | Buch | 978-0-7277-3593-5 | www.sack.de

Buch, Englisch, 606 Seiten, Format (B × H): 156 mm x 234 mm, Gewicht: 1021 g

Lark / ICE

Bridge Design Construction and Maintenance


1. Auflage 2007
ISBN: 978-0-7277-3593-5
Verlag: THOMAS TELFORD LTD

Buch, Englisch, 606 Seiten, Format (B × H): 156 mm x 234 mm, Gewicht: 1021 g

ISBN: 978-0-7277-3593-5
Verlag: THOMAS TELFORD LTD


Bridge engineering not only requires a comprehensive knowledge and understanding of design and construction techniques, but also demands that the challenge of the long-term behaviour and maintenance of such structures is met. This requires an innovative, multi-disciplinary approach built on a sound foundation of experience and research.
ICE organised an international conference on current and future trends in bridge design, construction and maintenance, in conjunction with a team of world-renowned bridge engineers and international organisations.

Lark / ICE Bridge Design Construction and Maintenance jetzt bestellen!

Autoren/Hrsg.


Weitere Infos & Material


Opening plenary session: State-of-the-art in long-span bridges

A new approach to geometric control of ultra-long span cable stay bridges

Incheon Bridge – fast track design check of the cable stayed bridge

Stonecutters Bridge – detailed design and construction of the superstructure

Stonecutters Bridge – design and construction of the towers

Advancements in long span bridge construction: the Stonecutters Bridge experience
Theme one: Lessons that can be learnt from the past

Arnodin and structural durability

Newcastle high-level bridge – refurbishment and strengthening of a historic road/rail bridge

Rebuilding the Alexander Hamilton Bridge – the future of bridge construction

Experience with application of various slab-on-girder bridge systems in Slovakia

Condition assessment and retrofitting of an old reinforced concrete arch bridge
Theme two: Advances in the understanding of the structural behaviour of bridges

Investigation of mechanical properties of corroded reinforcement using simulated corrosion

Some design improvements for integral bridges

Influence of locked-in girder stress on the design of suspension bridges

Influence of analysis models and damping method to nonlinear earthquake response of complex bridges

Long-term earth pressure measurements of two large-span flexible culverts in Norway

Three-dimensional seismic response analysis of self-anchored cable-stayed suspension bridge with response spectrum method
Theme three: Durability, structural reliability, risk management and health monitoring

Assessment of the dynamic behaviour of Jamuna multi-purpose bridge through noise study

Reliability analysis of pre-stressed bridge girders: comparison of Chinese codes (1989), (2004) and AASHTO LRFD specifications (2005)

Experience and results of experimental testing of bridges in Croatia

Numerical analysis of carrying capacity deterioration of existing reinforced concrete bridge and repair demand
Theme four: Bridge management and its relationship with infrastructure management

Accelerating the renewal of America’s highway bridges

Achieving best value and minimising disruption through bridge management plans

Effective governance of bridge management: UK example

Design of rehabilitation and refurbishment of existing r.c. bridges
Theme five: Innovation in bridge design, construction and repair

Strengthening of bridges using CFRP composites

Design of two curve cable stayed bridges with overlapped girders supported by a single “X” shape tower, Real Park Complex description in São Paulo – Brazil

New developments in underwater pile repair using fibre reinforced polymers

Rehabilitation design of a bascule bridge – including jacking up an 800-ton bascule leaf

An asymmetric curved cable stayed bridge in Parma (Italy)

Bridge widening – stitching a steel girder reinforced concrete composite bridge to a post-tensioned prestressed voided deck structure

The design and construction of the Pasteur-Cikapayang-Surapati elevated road and bridge project in Bandung, Indonesia

Horizontally curved composite plate girders

Assessment of stress conditions of a seismically damaged cable-stayed bridge after repair

Tiawan high speed rail project: the structures and quality management system – a case study

Self-consolidating concrete for on-site bridge applications

Design and construction of Otanerua Eco-Viaduct, Auckland, New Zealand

Identification of an FRP Deck using Iterative Training of Neutral Network

Structural optimization of the cable stayed arch

Underslung cable structures – a feasible alternative?

Six signature bridges in the People’s Republic of China

Aerodynamic study of cable oscillations and mitigation measures for long-span bridges

The lightweight aluminium panel for bridge redecking

Influence of erection method on consumption of prestressing steel in superstructure of prestressed concrete bridges

Strengthening of arched masonry bridges with retrofitting reinforcement – research and practice

Construct



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.