E-Book, Englisch, 254 Seiten
Sarin / Jaiprakash Flow Shop Lot Streaming
1. Auflage 2007
ISBN: 978-0-387-47688-9
Verlag: Springer
Format: PDF
Kopierschutz: 1 - PDF Watermark
E-Book, Englisch, 254 Seiten
ISBN: 978-0-387-47688-9
Verlag: Springer
Format: PDF
Kopierschutz: 1 - PDF Watermark
This book discusses the process of 'Lot Streaming' and how it can significantly improve the overall performance of a production process, and thereby, make the operation of a manufacturing system lean. It provides a complete introduction to the Flow Shop Lot Streaming Problem and provides a historical perspective. It further presents algorithms for a variety of lot streaming problems with numerical illustrations for ease of understanding and implementation.
Autoren/Hrsg.
Weitere Infos & Material
1;Preface;6
2;Contents;8
3;Introduction to the Lot Streaming Problem;11
3.1;1.1 Introduction;11
3.2;1.2 Terminology ;12
3.3;1.3 Assumptions, Notation, and Classification Scheme ;17
3.4;1.4 Dominance in Lot Streaming Models;19
3.5;1.5 Potential Benefits of Lot Streaming;19
3.6;1.6 A Brief Historical Perspective ;30
3.7;1.7 Applications of Lot Streaming;40
3.8;1.8 Chapter Summary;41
4;Generic Mathematical Models for the Flow Shop Lot Streaming Problem;43
4.1;2.1 Introduction;43
4.2;2.2 Some Generic Mathematical Models for the Flow Shop Lot Streaming Problem ;43
4.3;2.3 Mathematical Models for Special Cases;60
4.4;2.4 Chapter Summary;69
5;Two-Machine Lot Streaming Models;71
5.1;3.1 A Brief Overview;71
5.2;3.2 2/1/ C/{ NI,II}/ CV;73
5.3;3.3 2/1/ C/{ NI,II}/ DV;81
5.4;3.4 2/1/C/II/CV/{Lot-Detached Setup Times, No-Wait};91
5.5;3.5 2/1/C/II/ DV/{ Lot- Detached Setup Times, No-Wait};94
5.6;3.6 2/1/{C,V}/II/CV/nEi=1siCi2;98
5.7;3.7 2/1/C/II/CV/nEi=1siCi2, Sublot- Attached Setup Times;104
5.8;3.8 2/N/C/II/ DV/{ No Setup, Unit- Size Sublots};113
5.9;3.9 2/N/C/II/ DV/{ Lot- Detached Setup, Unit- Size Sublots};120
5.10;3.10 2/N/C/II/ DV/{ Lot- Attached Setup Times, Unit- Size Sublots};123
5.11;3.11 2/N/C/ II/{ CV,DV}/{ Lot- Detached/ Attached Setup and Lot- Attached Removal Times};126
5.12;3.12 2/N/C/ II/{ CV,DV}/{ Lot- Detached/ Attached Setup and Sublot- Attached Transfer Times};135
5.13;3.13 2/N/C/ II/{ CV,DV}/{ Lot- Detached Setup Times, No- Wait};146
5.14;3.14 2/N/E/II/DV/Sublot-Attached Setup Times;154
5.15;3.15 Chapter Summary;161
6;Three-Machine Lot Streaming Models;164
6.1;4.1 A Brief Overview;164
6.2;4.2 3/1/ C/{ NI,II}/{ CV,DV};166
6.3;4.3 3/1/ V/{ NI,II}/{ CV,DV};178
6.4;4.4 3/1/ C/{ NI,II}/CV/{ Lot- Detached Setup};182
6.5;4.5 3/1/C/II/ CV/{ Lot- Attached Setup};192
6.6;4.6 Chapter Summary;202
7;m-Machine Lot Streaming Models;204
7.1;5.1 A Brief Overview;204
7.2;5.2 m/1/C/II/CV ;208
7.3;5.3 m/1/C/II/DV;223
7.4;5.4 m/1/E/II/CV/Sublot-Attached Setup;225
7.5;5.5 m/N/E/II/CV;231
7.6;5.6 m/1/C/II/CV/E2i=1 xiCim;237
7.7;5.7 m/1/E/II/CV;245
7.8;5.8 Chapter Summary;250
8;Concluding Remarks;252
9;References;254
10;Index;257




