Buch, Englisch, 352 Seiten, Format (B × H): 178 mm x 254 mm, Gewicht: 826 g
Incorporating Equipment/Assets in the Decision-Making Process
Buch, Englisch, 352 Seiten, Format (B × H): 178 mm x 254 mm, Gewicht: 826 g
ISBN: 978-1-119-70773-8
Verlag: Wiley
Optimize asset decisions and improve the financial and technical operation of process plants
The process industries, particularly the refining and petrochemical industries, are comprised of capital-intensive business whose assets are valued in the trillions. Optimizing the function of refining and petrochemical plants is therefore not simply a process decision, but a business one, with even small improvements in efficiency potentially providing enormous margins. There is an urgent need for businesses to assess how the asset side of process industry production can be optimized.
Plant Optimization in the Process Industries offers a pioneering asset-focused approach to plant optimization. Optimization of operating values within a processing unit is a developed area of technology with a wide and varied literature; little attention has been paid to the asset side, making this a groundbreaking and invaluable work. Outlining a multi-tiered approach to financial optimization which adjusts the variables of a statistical asset model, this volume has the potential to revolutionize businesses and generate record profit margins.
Readers will also find: - Comparison and contrast of different technologies on the process and asset side of the industry
- Detailed discussion of constrained, non-linear optimization technology, along with basic functioning of Monte Carlo modelling
- A real-world case study followed through the book to facilitate understanding
This book is ideal for professionals who manage, design, operate, and maintain process industry facilities, particularly those in the hydrocarbon and chemical industries, as well as any asset-intensive industry.
Autoren/Hrsg.
Fachgebiete
- Technische Wissenschaften Technik Allgemein Mess- und Automatisierungstechnik
- Technische Wissenschaften Verfahrenstechnik | Chemieingenieurwesen | Biotechnologie Chemische Verfahrenstechnik
- Technische Wissenschaften Verfahrenstechnik | Chemieingenieurwesen | Biotechnologie Verfahrenstechnik, Chemieingenieurwesen
Weitere Infos & Material
Foreword by Ron Lambert xxi
About the Author xxiii
Acknowledgments xxviii
Disclaimer xxx
1 Optimizing a Process Plant 1
1.1 High-Level Business Goals 1
1.2 Profit 1
1.3 Each Plant Is Unique 3
1.4 Plant Optimization Nirvana 3
1.5 Process/Asset Views of the Business Need Alignment 5
1.6 Optimization Technologies on the Process Side of the Business 6
1.7 Optimization Technologies on the Asset Side of the Business 7
1.8 Conclusion 10
1.9 Future Chapters 11
2 Gen 1 – Transitioning from Reliability to Asset Management 14
2.1 Reliability’s Early Days 14
2.2 Rebranding Reliability to be Asset Management 15
2.3 Changing the Reliability Management Structure 16
2.4 Where Did Gen 1 Fall Short? 16
2.5 Adoption of Monte Carlo Simulation Technology Has Struggled 16
2.6 Asset Optimization Nirvana – The Future 17
2.7 Conclusion 19
3 Gen 2 – Plant Optimization Using Asset Modeling Methodologies 20
3.1 Gen 2 Philosophy 20
3.2 Gen 2 Asset Optimization Applications 23
3.3 Conclusion 31
4 Selecting the Best Improvement Projects – Optimal Process Unit Availability 32
4.1 Industry Challenge 34
4.2 Improvement Projects 35
4.3 Asset Optimization Technologies 38
4.4 Optimizer Definition 42
4.5 Optimization Example 45
4.6 More General Optimization 58
4.7 Does Reducing Availability Make Sense for Any of Our Process Units? 58
4.8 Conclusion 59
5 Monte Carlo Simulation Overview 61
5.1 Reliability Block Diagram (RBD) 62
5.2 Rolling the Dice 63
5.3 Histories within a Model Run 64
5.4 Results 65
5.4.1 Probability Distributions 65
5.5 Submodel – Detailed Process Unit Model 67
5.6 What Level of Detail Is Required? 68
5.7 Definitions 68
5.8 RAM Software Tools 69
5.9 Challenge to Monte Carlo Simulation Vendors 69
5.10 Conclusions 70
6 Optimizer Overview 71
6.1 Independent Variables 71
6.2 Dependent Variables 72
6.3 Constraints 72
6.4 Objective Function 72
6.5 Optimizer Problem Definitions 73
6.6 Conclusions 82
7 The Consultation Process – The Main Work Process 83
7.1 Nobody Has Excellent Data in the Process Industries 83
7.2 Why Operating Conditions Are so Important in the Process Industries 84
7.3 Tapping into Your Company’s Innate Knowledge 84
7.4 Golden Opportunity To Test the Approach 85
7.5 Consulting Meeting Details 87
7.6 Monte Carlo Modeler Software Inputs 91
7.7 Data from Asset Management Systems 92
7.8 Data Storage/Structure 93
7.9 Conclusion 94
8 Turnaround Considerations 95
8.1 Example Problem Overview 97
8.2 Results Expectations 102
8.3 Solution Approach 106
8.4 First Problem – Fixed Start Date and Duration 108
8.5 Second Problem – Fixed Start Date, but Flexible Duration 113
8.6 Last Problem – Flexible Start Date 116
8.7 Conclusion 118
9 What About Process Conditions? 119
9.1 Examples Where Feed Quality and Process Conditions Play a Major Role 119
9.2 Operating Condition Effect on Failure Data 120
9.3 Example Incorporating Process Conditions into Our Problem Definition 121
9.4 Conclusion 125
10 Opportunistic Maintenance Optimization 126
10.1 Modeling Maintenance Plan Options 127
10.2 Example Problem Data 128
10.3 Single Equipment Opportunistic Maintenance Optimization 130
10.4 Intra Unit Opportunistic Maintenance Optimization 132
10.5 Inter Unit Opportunistic Maintenance Optimization 135
10.6 Conclusion 138
11 Spare Parts Optimization 139
11.1 Spares Parts Dependence Often Masks Other Equipment Issues 139
11.2 Typical Methods for Estimating Spare Parts 140
11.3 Logistical Challenges 140
11.4 Lead Times/Price/Vendor Issues 141
11.5 Prioritization 142
11.6 Example Problem Data 144
11.7 Effect of Failure Standard Deviation 148
11.8 Optimization Problems Overview 149
11.9 Single Equipment Spares Optimization 151
11.10 Intra-Unit Spares Optimization 152
11.11 Inter-Unit Spares Optimization 154
11.12 Common Spare Across Multiple Units 157
11.13 Full-time Spare Parts Engineer Position 161
11.14 Conclusion 161
12 Task/Resource Optimization 162
12.1 Example Problem Data 163
12.2 General Approach 164
12.3 Single Equipment Task Optimization 166
12.4 Intra-Unit Equipment Task Optimization 169
12.5 Inter-Unit Equipment Task Optimization 172
12.6 Conclusion 178
13 Tankage Determination/Optimization 179
13.1 Why Tankage Size Matters 179
13.2 Example Problem Overview 180
13.3 Same Availability for both Upstream and Downstream Process Units 181
13.4 Downstream Availability Variable with Constant Upstream Availability 182
13.5 Conclusion 184
14 Improving Availability 185
14.1 Options to Improve Availability 186
14.2 How Reliability and Process Configuration Effects Availability Results 189
14.3 Which Option Is the Best? 190
14.4 Conclusion 191
15 Equipment Reliability Optimization 192
15.1 General Approach 193
15.2 Example Problem Data 195
15.3 First Impressions of Example Data – Impact on Problem Solution 196
15.4 Effect of Failure Standard Deviation 197
15.5 Single Equipment Design Optimization 198
15.6 Intra-Unit Design Optimization 201
15.7 Inter-Unit Design Optimization 210
15.8 Scenario Final Thoughts 212
15.9 Conclusion 212
16 Plant Optimization Within the Design Process 214
16.1 Combining Process Simulation with Monte Carlo Simulation 214
16.2 Balancing the




