Aschauer | Optimal Scheduling in a Hot Rolling Mill for Refractory Metals | Buch | 978-3-8440-9177-9 | sack.de

Buch, Englisch, Band 63, 109 Seiten, Format (B × H): 170 mm x 240 mm, Gewicht: 236 g

Reihe: Modellierung und Regelung komplexer dynamischer Systeme

Aschauer

Optimal Scheduling in a Hot Rolling Mill for Refractory Metals


Erscheinungsjahr 2023
ISBN: 978-3-8440-9177-9
Verlag: Shaker

Buch, Englisch, Band 63, 109 Seiten, Format (B × H): 170 mm x 240 mm, Gewicht: 236 g

Reihe: Modellierung und Regelung komplexer dynamischer Systeme

ISBN: 978-3-8440-9177-9
Verlag: Shaker


The present work deals with the optimal scheduling of refractory metal products in a hot rolling mill. The scheduling problem is identified to be a so-called no-wait flexible job-shop scheduling problem with flexible processing times. It is formulated as a mixed-integer optimization problem and since this problem is NP-hard, a heuristic solution strategy is used. In fact, the overall problem is divided into a timetabling problem and a sequence optimization problem. For the timetabling, a recursive algorithm is developed, which takes into account the no-wait constraints and takes advantage of the flexible processing times. A tabu search algorithm is used for the sequence optimization.

Another focus of the work is the consideration of special constraints, i.e., release and due times, shift work, restrictions for products of the same order, and configuration changes of individual furnaces. These constraints are divided into hard and soft constraints. Violations of hard constraints are algorithmically avoided, and violations of soft constraints are taken into account by penalty terms in the cost function.

Systematic consideration of statistical information about processing times to improve the robustness of the planning result is also of interest. For this purpose, safety margins are planned during the timetabling. In the sequence optimization, tasks with high standard deviations at positions with low safety margins are penalized.

Finally, the implementation of the scheduling algorithm at the industrial plant is presented. An optimal schedule is planned based on the current plant status, the available products, and the planned work shifts.

Aschauer Optimal Scheduling in a Hot Rolling Mill for Refractory Metals jetzt bestellen!

Autoren/Hrsg.




Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.