Blazewicz / Ecker / Schmidt Scheduling in Computer and Manufacturing Systems


2. Auflage 1994
ISBN: 978-3-642-79034-8
Verlag: Springer
Format: PDF
Kopierschutz: 1 - PDF Watermark

E-Book, Englisch, 312 Seiten, eBook

ISBN: 978-3-642-79034-8
Verlag: Springer
Format: PDF
Kopierschutz: 1 - PDF Watermark



Let us start with the description of the purpose of this book. First we should explain how we understand its tide. In general, scheduling problems can be understood very broadly as the problems of the allocation of resources over time to perform a set of tasks. By resources we understand arbitrary means tasks compete for. They can be of a very different nature, e.g. manpower, money, processors (machines), energy, tools. Also tasks can have a variety of interpretations starting from machining parts in manu facturing systems up to processing information in computer systems. The same is true for task characteristics, e. g. ready times, due dates, relative urgency weights, functions describing task processing in relation to allotted resources. Moreover, a structure of a set of tasks, reflecting precedence constraints among them, can be defined in different ways. In addition, different criteria which measure the quality of the performance of a set of tasks can be taken into account.

Blazewicz / Ecker / Schmidt Scheduling in Computer and Manufacturing Systems jetzt bestellen!

Zielgruppe


Research

Weitere Infos & Material


1 Introduction.- References.- 2 Preliminaries.- 2.1 Sets and Relations.- 2.2 Problems, Algorithms, Complexity.- 2.3 Graphs and Networks.- 2.4 Enumerative Methods.- 2.5 Heuristic and Approximation Algorithms.- References.- 3 Formulation of Scheduling Problems.- 3.1 Definition of Scheduling Problems.- 3.2 Analysis of Scheduling Problems and Algorithms.- 3.3 Motivations for Deterministic Scheduling Problems.- 3.4 Classification of Deterministic Scheduling Problems.- References.- 4 Single Processor Scheduling.- 4.1 Minimizing Schedule Length.- 4.2 Minimizing Mean Weighted Flow Time.- 4.3 Minimizing Due Date Involving Criteria.- 4.4 Minimizing Change-Over Cost.- 4.5 Other Criteria.- References.- 5 Parallel Processor Scheduling.- 5.1 Minimizing Schedule Length.- 5.2 Minimizing Mean Row Time.- 5.3 Minimizing Due Date Involving Criteria.- 5.4 Other Models.- References.- 6 Static Shop Scheduling.- 6.1 Flow Shop Scheduling.- 6.2 Open Shop Scheduling.- 6.3 Job Shop Scheduling.- References.- 7 Resource Constrained Scheduling.- 7.1 Classical Model.- 7.2 Scheduling Multiprocessor Tasks.- 7.3 Scheduling with Continuous Resources.- References.- 8 Scheduling in Flexible Manufacturing Systems.- 8.1 Introductory Remarks.- 8.2 Scheduling Flexible Flow Shops.- 8.3 Scheduling Dynamic Job Shops.- 8.4 Simultaneous Scheduling and Routing in some FMS.- References.- 9 From Theory to Practice.- 9.1 Scheduling in Computer Integrated Manufacturing.- 9.2 Solution Approaches Based on Artificial Intelligence.- 9.3 Integration of Knowledge and Algorithms.- References.



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.