Kimball | 2018 International Existing Building Code Handbook | Buch | 978-1-260-13478-0 | www.sack.de

Buch, Englisch, 256 Seiten, Format (B × H): 193 mm x 236 mm, Gewicht: 635 g

Kimball

2018 International Existing Building Code Handbook


Erscheinungsjahr 2019
ISBN: 978-1-260-13478-0
Verlag: McGraw Hill LLC

Buch, Englisch, 256 Seiten, Format (B × H): 193 mm x 236 mm, Gewicht: 635 g

ISBN: 978-1-260-13478-0
Verlag: McGraw Hill LLC


Renovate, repair, or retrofit existing buildings in complete compliance with the 2018 IEBCThis practical guide shows, step by step, how to apply the provisions of the 2018 International Existing Building Code® (IEBC) when performing repairs, change of occupancy retrofits, and seismic evaluations in buildings of all sizes. The book contains all the information you need to understand with the complex provisions in the code and apply them properly to meet structural safety requirements.2018 International Existing Building Code Handbook® opens with an overview of the IEBC and of permits, construction documents, and other administration requirements. It goes on to explain the three different project methods that can be followed under the IEBC—the prescriptive method, the work area method, and the performance compliance method. Throughout, flowcharts and illustrated examples clearly demonstrate the proper application of the code in real-world projects.•Fully aligns with the 2018 International Existing Building Code® •Covers prescriptive, work area, and performance compliance methods•Written by an ICC MCP who has conducted numerous seminars on the IEBC

Kimball 2018 International Existing Building Code Handbook jetzt bestellen!

Autoren/Hrsg.


Weitere Infos & Material


About the Author

About the International Code Council

Contents

Preface

Chapter 1 Introduction

1.1 Building Code History

1.1.1 King Hammurabi (1758 B.C.)

1.1.2 Great Fire of London (1666)

1.1.3 Chicago Fire of 1871 and the “Great Rebuilding”

1.1.4 1905 National Building Code

1.1.5 UBC, SBCC, and BOCA

1.1.6 The International Codes

1.1.7 History of the IEBC

1.2 Why the IEBC?

1.3 Scope

1.4 Key Terms

1.5 Layout

1.5.1 Compliance methods

1.5.2 Repairs

1.5.3 Moved buildings

1.5.4 Referenced standards

1.5.5 Appendices

1.6 2018 IEBC Updates

Chapter 2 Administration

2.1 Duties of the Building Department

2.2 Work Requiring a Permit

2.3 Permit Submittals

2.3.1 Construction documents (IEBC § 106.2)

2.3.2 Geotechnical investigations

2.3.3 Structural calculations

2.3.4 Energy compliance reports

2.3.5 Special inspection and structural observation programs

2.3.6 Investigation and evaluation reports

2.4 Inspections

2.5 Certificate of Occupancy

2.6 Board of Appeals

2.7 Violations and Stop Work Orders

2.8 Unsafe Buildings

Chapter 3 Common Provisions

3.1 Introduction

3.2 General Provisions

3.2.1 Dangerous conditions

3.2.2 Additional codes

3.2.3 Existing materials

3.2.4 New and replacement materials

3.2.5 Occupancy and use

3.3 Structural Requirements

3.3.1 Live loads

3.3.2 Snow loads

3.3.3 Seismic evaluations

3.4 ASCE 41-17

3.4.1 Performance objective

3.4.2 Evaluation tiers

3.4.3 Rehabilitation tiers

3.4.4 Evaluation report requirements

3.4.5 Special inspections and testing

3.4.6 Third-party peer review

3.5 In Situ Load Tests

3.6 Accessibility

3.6.1 Background

3.6.2 Existing buildings

3.6.3 Technical infeasibility

3.6.4 Primary function area

3.6.5 Change of occupancy

3.6.6 Additions

3.6.7 Alterations

3.6.8 Primary function areas

3.6.9 Scoping for alterations

3.6.10 Historic buildings

Chapter 4 Repairs

4.1 Introduction

4.2 Flood Hazard Areas

4.2.1 Substantial improvement versus substantial damage

4.2.2 Code official determination

4.2.3 Examples

4.2.4 Building inspections

4.3 Safety Glazing

4.3.1 Glazing in and near doors

4.3.2 Glazing in windows

4.3.3 Glazing in guards and railings

4.3.4 Glazing and wet surfaces

4.3.5 Glazing near stairs and ramps

4.4 Fire Protection and Means of Egress

4.4.1 Fire protection

4.4.2 Means of egress

4.5 Structural

4.5.1 Substantial structural damage

4.5.2 Disproportionate earthquake damage

4.5.3 Less than substantial

4.6 Electrical

4.6.1 Receptacles

4.6.2 Plug fuses

4.6.3 Nongrounding-type receptacles

4.6.4 Group I-2 receptacles

4.6.5 Grounding of appliances

4.7 Mechanical

4.8 Plumbing

Chapter 5 Prescriptive Method

5.1 General

5.2 Additions

5.2.1 Disproportionate earthquake damage

5.2.2 Flood hazard areas

5.2.3 Gravity structural elements

5.2.4 Lateral structural elements

5.2.5 Smoke alarms

5.2.6 Carbon monoxide alarms

5.2.7 Additions to Group E

5.3 Alterations

5.3.1 Flood hazard areas

5.3.2 Gravity structural elements

5.3.3 Lateral structural elements

5.3.4 Seismic Design Category F

5.3.5 Bracing of URM parapets during reroof

5.3.6 Anchorage of concrete or masonry walls

5.3.7 Anchorage of URM walls

5.3.8 Bracing of URM parapets due to alteration

5.3.9 Anchorage of URM partitions

5.3.10 Substantial structural alteration

5.3.11 Roof diaphragms in high wind

5.3.12 Voluntary LFRS upgrade

5.3.13 Smoke alarms

5.3.14 Carbon monoxide alarms

5.3.15 Refuge areas

5.4 Fire Escapes

5.4.1 Location

5.4.2 Construction

5.4.3 Dimensions

5.4.4 Opening protectives

5.5 Window Replacement

5.5.1 Opening control devices

5.5.2 Emergency escape and rescue openings

5.6 Change of Occupancy

5.6.1 Change of occupancy classification

5.6.2 Change from one group to another

5.6.3 Change in use within a group that triggers change in application of the code

5.6.4 Stairways

5.6.5 Structural

5.7 Historic Buildings

5.7.1 Life safety hazards

5.7.2 Flood hazard areas

5.7.3 Structural

Chapter 6 Work Area Method

6.1 General

6.2 Alterations: Level 1

6.2.1 Building elements and materials

6.2.2 Reroofing

6.2.3 Structural

6.3 Alterations: Level 2

6.3.1 Building elements and materials

6.3.2 Fire protection

6.3.3 Carbon monoxide detection

6.3.4 Means of egress

6.3.5 Structural

6.3.6 Electrical

6.3.7 Mechanical

6.3.8 Plumbing

6.3.9 Energy conservation

6.4 Alterations: Level 3

6.4.1 Special use and occupancy

6.4.2 Building elements and materials

6.4.3 Fire protection

6.4.4 Means of egress

6.4.5 Structural

6.4.6 Energy conservation

6.5 Change of Occupancy

6.5.1 Special use and occupancy

6.5.2 Structural

6.5.3 Electrical

6.5.4 Mechanical

6.5.5 Plumbing

6.5.6 Light and ventilation

6.5.7 Fire protection

6.5.8 Means of egress

6.6 Additions

6.6.1 Heights and areas

6.6.2 Structural

6.6.3 Smoke alarms

6.6.4 Carbon monoxide alarms

6.6.5 Storm shelters

6.6.6 Energy conservation

6.7 Historic Buildings

6.7.1 Historic building report

6.7.2 Flood hazard areas

6.7.3 Repairs

6.7.4 Fire safety

6.7.5 Change of occupancy

6.7.6 Structural

6.7.7 Relocated buildings

Chapter 7 Performance Compliance Method

7.1 Background

7.2 Components of Performance-Based Design

7.3 Scope

7.4 Applicability

7.4.1 Change in occupancy

7.4.2 Additions

7.4.3 Alterations

7.5 Other Design Disciplines?

7.6 Acceptance

7.7 Investigation and Evaluation

7.8 Structural Analysis

7.9 Evaluation Process

7.9.1 Height and area

7.9.2 Compartmentation

7.9.3 Unit separations

7.9.4 Corridor walls

7.9.5 Vertical openings

7.9.6 Heating, ventilation, and air conditioning (HVAC) systems

7.9.7 Automatic fire detection

7.9.8 Fire alarm systems

7.9.9 Smoke control

7.9.10 Means of egress

7.9.11 Dead ends

7.9.12 Maximum exit travel distance

7.9.13 Elevator control

7.9.14 Means of egress emergency lighting

7.9.15 Mixed occupancies

7.9.16 Automatic sprinklers

7.9.17 Standpipes

7.9.18 Incidental uses

7.9.19 Smoke compartmentation

7.9.20 Patient ability, concentration, smoke compartment location, and ratio to attendant

7.10 Building Score

Chapter 8 Relocated or Moved Buildings

8.1 Introduction

8.2 Scope and Conformance

8.3 Location on the Lot

8.3.1 Site plan

8.3.2 Proximity to lot line

8.3.3 Foundations near slopes

8.3.4 Mechanical exhaust and intake openings

8.4 Foundation

8.4.1 International Residential Code

8.4.2 International Building Code

8.5 Wind, Seismic, Snow, and Flood Loads

8.5.1 Wind loads

8.5.2 Seismic loads

8.5.3 Snow loads

8.5.4 Flood loads

8.6 Inspections and Repairs

8.7 Conclusion

Chapter 9 Construction Safeguards

9.1 General

9.1.1 Fire safety

9.1.2 Protection of pedestrians

9.1.3 Sanitary facilities

9.2 Adjoining Properties

9.3 Fire and Life Safety Precautions

9.3.1 Fire extinguishers

9.3.2 Means of egress

9.3.3 Standpipes

9.3.4 Fire sprinklers

9.3.5 Fire protection water supply

9.4 Accessibility

Chapter 10 IEBC Appendices

10.1 Appendix A: Seismic Retrofit

10.1.1 Chapter A1: Unreinforced masonry (URM) bearing wall buildings

10.1.2 Chapter A2: Reinforced concrete and masonry buildings

10.1.3 Chapter A3: Wood-frame buildings

10.1.4 Chapter A4: Open-front wood-frame buildings

10.2 Appendix B: Accessibility Items

10.2.1 Historical buildings

10.2.2 Transportation facilities

10.2.3 Dwelling units and sleeping units

10.3 Appendix C: Wind Retrofit

10.3.1 Gable end retrofit

10.3.2 Roof deck fastening

10.4 Resource A: Archaic Materials

References

Index



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.