Construction Project Scheduling and Control


5. Auflage 2025
ISBN: 978-1-394-21572-0
Verlag: Wiley John + Sons

Buch, Englisch, 704 Seiten, Format (B × H): 189 mm x 241 mm, Gewicht: 1408 g

ISBN: 978-1-394-21572-0
Verlag: Wiley John + Sons


Comprehensive guide examining analytical methods used to devise an efficient and successful schedule for construction projects of all sizes

The newly revised and updated Fifth Edition of Construction Project Scheduling and Control describes the tools and methods that make projects run smoothly, with invaluable information from a noted career construction professional, along with updated information on Building Information Modeling (BIM) and new technologies impacting project scheduling. The first chapter is now replaced by two chapters on planning and scheduling, separately. A new chapter on optimizing the schedule that applies all scheduling concepts has been added. The book also includes worked problems and exercises with scheduling software hints to enable students and practicing professionals to apply critical thinking to issues in construction scheduling.

This Fifth Edition includes a revised chapter on the definition of the critical path, which follows a discussion of resource management, schedule updating and project control, schedule acceleration, risk, and other topics. This edition also includes numerous notes on all aspects of the project that may impact the schedule. In addition, it features a chapter on project scheduling and control as viewed through the owner’s perspective, as well as an expanded glossary, a list of acronyms, and more. Instructors who adopt this book will be provided with valuable materials including PowerPoint lecture slides, an instructor’s manual with complete solutions to the book’s exercises, and additional questions for exams.

Sample topics covered in Construction Project Scheduling and Control include: - Planning and scheduling as two different but related concepts
- Bar (Gantt) charts
- Basic networks, covering arrow networks, node networks, a comparison between the two, networks versus bar charts, and time-scaled logic diagrams
- Precedence networks, covering CPM calculations for precedence diagrams for contiguous and interruptible activities and types of lags
- Resource allocation and leveling, covering labor, equipment, and materials, and assigning budgets in computer scheduling programs
- Schedule updating and project control, covering steps for updating a schedule, measuring work progress, and earned value managament (EVM)

- Schedule acceleration concepts and techniques, and the impact of schedule acceleration on cost
- Reports and documentation, especially as related to the project schedule
- Schedule risk management
- Delay and other claims management
- Other scheduling methods, such as PERT and LSM
- Dynamic Minimum Lag (DML) relationship (a new concept)
- BIM and other technologies in modern construction scheduling

- Construction scheduling from the owner’s perspective

Written for undergraduate and graduate students in construction management, civil engineering, and architecture, as well as practicing construction management professionals, the Fifth Edition of Construction Project Scheduling and Control is an essential resource for gaining a foundational understanding of the field, along with the latest and most effective practices.

Mubarak Construction Project Scheduling and Control jetzt bestellen!

Autoren/Hrsg.


Weitere Infos & Material


Preface xvii

About the Companion Website xix

Chapter 1 Introduction to Project Planning 1

Chapter 2 Introduction to Project Scheduling 19

Chapter 3 Bar (Gantt) Charts 41

Chapter 4 Basic Logic Networks 51

Chapter 5 The Critical Path Method (CPM) 75

Chapter 6 Precedence Networks 133

Chapter 7 Resource Management 173

Chapter 8 Schedule Updating and Project Control 209

Chapter 9 Schedule Acceleration and Time-Cost Trade-Off 275

Chapter 10 Reports and Presentations 325

Chapter 11 Scheduling as Part of the Project Management Effort 349

Chapter 12 Other Scheduling Methods 377

Chapter 13 Dynamic Minimum Lag Relationship 421

Chapter 14 Schedule Risk Management 441

Chapter 15 Construction Delays and Other Claims 471

Chapter 16 Optimizing the CPM Schedule 499

Chapter 17 The Critical Path Definition: Revisited 525

Chapter 18 BIM and Other Technologies in Modern Construction Scheduling 545

Chapter 19 Project Scheduling for Owners 561

Appendix A Computer Project 583

Appendix B Sample Reports 597

Abbreviations 629

Glossary 635

Bibliography 663

Index 673


Dr. Saleh Mubarak (Tampa, FL) is a professor and an independent consultant in construction project management, focused on training, writing, public speaking, and consulting. He is an adjunct professor at the University of South Florida (USF) and a former professor at several universities. He is also an active member of AACE International and a former member of PMI. He served on the PMI committee that created the professional scheduler certification exam. He has more than 35 years of diversified and international experience in academia and industry in private and public sectors.



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.