Müller | Integrated Materials Handling in Manufacturing | Buch | 978-3-662-12094-1 | sack.de

Buch, Englisch, 121 Seiten, Format (B × H): 140 mm x 216 mm, Gewicht: 172 g

Müller

Integrated Materials Handling in Manufacturing


Softcover Nachdruck of the original 1. Auflage 1985
ISBN: 978-3-662-12094-1
Verlag: Springer

Buch, Englisch, 121 Seiten, Format (B × H): 140 mm x 216 mm, Gewicht: 172 g

ISBN: 978-3-662-12094-1
Verlag: Springer


ANUFACTURING in mechanical engineering enterprises is M characterised by fundamental changes both inside and outside the l11 organisation. Inside the organisation, account must be taken of increasing cost pressures in wages, materials, energy and stocks, all of which necessitate making the most effective use possible of manufacturing capacity. Outside the organisation, changes in consumer demand take place. These stem from increasing domestic and foreign competition which result in an increase in the volume of deliveries, a proliferation of products and a related shortening of product life-cycles. These give rise to wider component ranges involving smaller quantities which, because of increasingly necessary changes in materials and despite higher stocks, still lead to longer throughput times. These trends impose a continuous pressure on businesses to take steps to rationalise both organisational and technical procedures. When considering the introduction of new technology and raw materials or the re-organisation of labour-intensive manufacturing plants, considerable weight has been given up to now to the automation of production processes. As shown in Fig. 1, which is an analysis of working hours of manufacturing units, successful rationalisation has been achieved already in this way; this has brought a relatively high and cost-effective utilisation of the manufacturing facilities related to the l21 planned operating time.

Müller Integrated Materials Handling in Manufacturing jetzt bestellen!

Zielgruppe


Research

Weitere Infos & Material


One — Introduction.- Two — Analysing problems and setting objectives.- Three — Integration in the context of technical investment planning.- Four — Using the latest technology.- Five — Developing alternatives.- Six — Developing production concepts.- Seven — Conclusion.- References.



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.